Technical Information as on 31.03.2015

TECHNICAL PARAMETERS PER EMPLOYEE
YEAR CKM MVA REVENUE RETURN
2007-08 3.63 5.15 15.67 2.92
2008-09 3.44 5.02 19.99 6.19
2009-10 3.86 6.01 25.89 6.20
2010-11 3.76 6.29 25.85 6.20
2011-12 4.02 6.98 27.27 6.23
2012-13 4.18 7.91 37.49 12.16
2013-14 4.59 9.02 41.17 14.29
2014-15 4.90 9.97 41.44 10.94

Total No. of EHV Sub-Station 113
400 KV Sub-Station 04
220 KV Sub-Station 21
132 KV Sub-Station 78
66 KV Sub-Station 08
Switching Sub-Station 02

TOTAL INSTALLED MVA CAPACITY 24551.50 MVA
TOTAL EHV LINES 12042.54 CKM
(i) 400 KV Lines 1644.700 CKM
(ii) 220 KV Lines 2941.50 CKM
(iii) 132 KV Lines 7035.34 CKM
(iv) 66 KV Lines 421.00 CKM

TOTAL AMOUNT OF ENERGY HANDLED / YEAR 41423 MU

UP COMING EHV Sub-Stations DURING 12TH PLAN (2012-13 to 2016-17) 35 No.
400 KV Sub-Station 03 Nos. Total Capacity : 7300 MVA
220 KV Sub-Station 11 Nos.
132 KV Sub-Station 21 Nos.

UP COMING EHV Lines DURING 12TH PLAN 103 No.
400 KV Line 797.6 Circuit Km Total 3508.4 Circuit Km
220 KV Line 855.0 Circuit Km
132 KV Line 1855.8

132KV Switching Substations Hind Motor
Farakka

District wise EHV Substations
Bankura 05 Nos.
Birbhum 03 Nos.
Burdwan 10 Nos.
Cooch Behar 01 Nos.
Dakshin Dinajpur 02 Nos.
Darjeeling 05 Nos.
Hoogly 10 Nos.
Howrah 07 Nos.
Jalpaiguri 11 Nos.
Malda 02 Nos.
Murshidabad 08 Nos.
Nadia 06 Nos.
Paschim Midnapur 08 Nos.
Purba Midnapur 07 Nos.
Purulia 04 Nos.
Uttar Dinajpur 02 Nos.
24 Parganas (North) 12 Nos.
24 Parganas (South) 08 Nos.
TOTAL 111 Nos.